HARDIBACKER INSTALLATION PDF

HardieBacker™ cement board. Simple. Reliable. Durable. The water resistant tile backerboard. What are you tiling on when you are refurbishing or installing a. 3 | attach HardieBacker cement board to countertop. • Apply a supporting bed of dry-set mortar or modified thinset to plywood with a 1/4” square-notched trowel. If you’re preparing to do a ceramic floor or wall installation, it’s recommended that you install HardieBacker cement board on your subfloor or wall before you.

Author: Bazil Nataxe
Country: Qatar
Language: English (Spanish)
Genre: Literature
Published (Last): 12 January 2007
Pages: 156
PDF File Size: 4.46 Mb
ePub File Size: 18.49 Mb
ISBN: 543-2-47810-894-4
Downloads: 78041
Price: Free* [*Free Regsitration Required]
Uploader: Digore

HardieBacker cement boards present a perfect substitution for traditional plywood and plasterboard substrates, due to the increased dimensional stability, strength and overall improved moisture and mould resistance.

HardieBacker Cement Boards Installation Instructions

They include a patented Mouldblock Technology which only expands their application to even the wettest areas such as kitchens and bathrooms which is not the case with the available alternatives. Namely, while traditional tiles and internal finishes substrates cannot fight the mould growth or moisture expansionthus causing cracking of the tiles, timber wrapping and only increasing maintenance costs, these boards are gypsum free, meaning that they will not disintegrate when exposed to high levels of moisture.

The boards are available in two sizes, 6mm and 12mmand differ in application and installation process.

The insfallation boards are mainly used for floors, while the 12mm boards are meant for wall substrates. Both available board types are applicable to masonry walls, when the access is limited. Prior to moving on to the HardieBacker board installation instructionsit is important to keep a few important facts in mind:. Another important thing you need to know installatin that the HardieBacker boards contain crystalline silica which is inert itself, but using power tools when cutting or drilling can cause particles to be released which could present danger for your health, if you would be overexposed or inhale larger quantities.

  CUENTO EL ALMOHADON DE PLUMAS PDF

In order of ensuring adequate protection, you should always hardibackwr the work outside or in a well-ventilated space, use adequate tools, wear protective equipment such as a face mask, and make sure to clean the space and your clothes from any settled debris once the job is done.

HardieBacker Cement Boards Installation Instructions

HardieBacker boards can be easily cut with the carbide tipped scoring knife. The boards should be scored with a installtaion edge and pulled upwards. If you need to make circular cuts, just installztion the hole, mark the weak point in the centre and tap it with a hammer. As upper mentioned, 6mm HardieBacker boards are usually used for internal floors, however the 12mm boards are also applicable in case additional height is necessary.

The boards should be installed onto a clean and smooth surface, so make sure to remove any debris or dust. Also remove and fix any floor damages such as uneven, warped or loose floorboards.

In order of avoiding excessive flex which can lead to tile cracks, make sure:. The spacing between the joists should not exceed mm centres.

Gaps of minimum 3mm between the wall edges and the floor should be filled with adequate moisture resistant sealant. The boards can be easily scored and snapped and necessary cuts implemented. The chosen non-flexible tile adhesive should be applied to the subfloor when the 6mm HardieBacker floor board should be slowly embed into harsibacker wet adhesive.

The boards are fixed to the subfloor surface with screws and nails installed every mm, 15mm apart from the edges of the board and 50mm from its corners. A 50mm alkaline-resistant Fibatape should be added over the joints and the tiles hqrdibacker onto the boards.

  ILJIN BEARING PDF

Stud centres installatiion be at maximum mm and all corners blocked with adequate timber. The boards can be installed both vertically and horizontally, so just score and snap the boards and make necessary cuts. If you are using timber studs, then 30mm galvanised nails or screws should be used as fixings.

The boards should be installed at least 6mm above the floor and the joints filled with adequate moisture resistant sealant. The boards are fixed 15mm apart from the edges of the board and 50mm from its corners. Please consult the applicable regulation in order of determining whether a vapour control barrier is necessary. Both 6mm and 12mm HardieBacker cement boards can be used on hardibackwr walls whenever you are dealing with a confined space.

The boards should be installed onto a clean and smooth surface and gardibacker remained dry lining removed prior to installation.

The boards are then evenly covered with adequate gap filling cartridge adhesive and pressed against the designated wall surface. Used fixings stainless steel screws should not be overdriven but flush with the face of the board. Install the screws at least 50mm into the wall, 50mm from the right and left edges and mm from the top and bottom ones.